fandox
fandox fandox
  • 02-06-2017
  • Mathematics
contestada

If it takes 4 men 6 hours to repair a road, How long will it take 3 men to do the job if they work at the same rate ? A) 5 hours B) 6 hours C) 8 hours D) 9 hours

Respuesta :

Аноним Аноним
  • 02-06-2017
answer is C) 8 hours

hope it helps
Answer Link
shanobaigwa
shanobaigwa shanobaigwa
  • 07-08-2021

Answer:

step 1 : 4men = 6 hrs

3 men =  ?

step 2 : 4 times 6 = 24

step 3 : 24 divided by 3 = 8

ANSWER: 8 hours (c)

Answer Link

Otras preguntas

factoring 12m^2n^2-8mn+1=
Why do Andhra Pradesh donot recive any snow fall during during winter months. PLEASE HELP.....EXAM TOMORROW
all fractions between 0 and 1/4
Round 13 513 to the nearest thousand
Given the inequalities y > 5x-8 and y >3x+4, find the point that satisfies neither inequalities
In Romeo and Juliet act 2, which character serves as a messenger
how do I solve x+2y=8
a person who studies word origins and meanings would most likely be a
Kim estimates that the faucet in her kitchen drips at a rate for 1 drop every 2 seconds. Erik wants to klnow how many times the faucet drips in a week.
A construction contractor is purchasing granite tiles for a new kitchen floor. Each tile costs $5 and he wants to spend less than $1,500. The size of each tile