Yolajczykid Yolajczykid
  • 03-02-2017
  • Mathematics
contestada

A group of workers can plant 5/8 acres in 4/5 days. what the unit rate in acres per day

Respuesta :

dwaynecouch44 dwaynecouch44
  • 03-02-2017
it would be .5 acres per day
Answer Link

Otras preguntas

Arthropod exoskeletons and mollusc shells both ________.a.are secreted by the mantleb.help retain moisture in terrestrial habitatsc.are comprised of the polysac
A cell was prepared by dipping a Cu wire and a saturated calomel electrode into 0.10 M CuSO4 solution. The Cu wire was attached to the positive terminal of a po
A 15.0-Ω resistor and a coil are connected in series with a 6.30-V battery with negligible internal resistance and a closed switch. (a) At 2.00 ms after the sw
Over​ time, the gap between the wages of workers with a college degree and the wages of workers without a college degree has been increasing. ​ Shouldn't this g
Recently, some executives for highway construction companies agreed to stop competing with each other on price and to meet every three months to decide their pr
What is the common ratio of the sequence 4, 7, 10, 13....
how many means add or subract​
What did the Glass-Steagall Act do?
x=8 (x,y) x=8 (x,y) x=8 (x,y)
What are 3 pieces of evidence that supports the theory of continental drift?