razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

what is the most accurate measurement of 1 pound​
A radio is on sale for $50. If this price represents a 10% discount from the original price, what is the original price to the nearest cent?
What is the role of consumers in determining what is produced in a market economy
Hand puppets are popular in China. So are string puppets. Shadow puppets are popular, too. Which combines the sentences using a coordinating conjunction?
Please Help! Which of the following is Not one of the three default components listed in the inspector view of a terrain assets? Transform Terrain Terrian Colli
what did aztecs enjoyed doing​
without sodium potassium pumps, what could happen to cells
The owner of a large manufacturing plant pays the base rate of $11.24 per $100 in wages paid for workers’ compensation insurance. The payroll for September is $
Try this one. Which Triangle is similar to the triangle above?
The development of a new tool does not change society. TrueFalse