colt3493 colt3493
  • 02-02-2021
  • Mathematics
contestada

How much money does Bob the Brick-layer need for his material costs?
He can lay 100 bricks in an hour. He charges $150 per hour for brick laying,
What is the total cost for Bob to do the job?

Respuesta :

babyjoj
babyjoj babyjoj
  • 02-02-2021
15,000 I think if I’m wrong then sorry
Answer Link

Otras preguntas

simplify 5.142857142857143
Find all the missing angles and show your work.
150 - x - 2x = 120 + 2x
A car starts from rest and accelerates for 3.2 s with an acceleration of 3.8 m/s ^2 How far does it travel? Answer in units of m.
Which product is positive? BA :) OGO (100) G 8 3
After a while, I CHECKED the feelings and realized that I could
Several devices developed by Thomas Edison led to the?
Which of these functions has a y-intercept of (0, 7)? Select all that apply
help me with my answers​
Sue is admitted to the hospital after having a stroke. She is experiencing the following symptoms: episodes of intense, unexplainable fear; blindness in her rig