katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

Read the poem. Chores Spritz, clean, scrub. Wipe, swipe, rub Pane after pane. Windows are a waste! Unless… I share the clouds with a flock. A soaring clone
31 is equal to 121 divided by y
What is the answer to 60÷5 (7-4)? Explain step by step how you get to this answer?
And it's important to mention measuring the specific heat for a certain object is done by using the calorimetry as a water container that is thermally insulated
Find the value of m,if the distance between A(2,-1) and B(m,-5) be 4√2 units[tex]d = [/tex]​
Evelyn placed $1,500 in a savings account with 5.2% interest, compounded annually. How much will she have in the account after 12 years? round your answer to th
Describe the octet rule and the part it plays in bonding.
Determine the value of yy, if xx is 99. y, equals, x, squared, plus, 10 y= x 2 +10
What is the common difference in the sequence 10, 20, 30, 40, 50,... ? A. 10 B. -10 C. 1/2D. -1/2
A O 'B D C A. scrotum C. epididymis What structure is C? B. vas deferens D. testicle