​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

background of black consciousness movement​
what are three major lines of evidence that mitochondria arose from endosymbiosis with proteobacteria?
What happens in the story of Arachne? Who wins? What does Athene weave? What does Arachne become?
Match each set of measurements to the correct calculated volume of a cylinder. Cylinder V=Bh diameter = 6 ft, height = 2.5 ft volume = 20 ft radius = 2 ft, heig
You are studying corresponding DNA sequences from three species of trout, which is a type of fish. What questions can you ask, and then investigate, to help de
Question provided in image:
A cone with a height of 15 yards has a volume of 475.17 yd³. Find the diameter of the cone.
A characteristic of an edge city is that it is environmentally friendly and encourages walkability grows during the workday as workers arrive has strict HOA cov
I need help please!!!!!!
will give brainliest to first answer+20pts In the figure shown, what is the measure of angle x? Triangle ABC has measure of angle BAC equal to 30 degrees and th